485 reviews · 15+ years post-construction cleaning

Bathroom Post-Renovation Cleaning

Bathroom Post-Renovation Cleaning

Who it is for

When to book Bathroom Post-Renovation Cleaning

A new bathroom in an otherwise finished house

The rest of the home is clean and this room is still dusty and stickered.

An en suite after a loft conversion

Dust from the stair has settled on the new tray and glass.

Before the room is used

You want grit out of the channel and film off the screen.

Variants

How people ask for this job

Standard bathroom

Bath or tray, basin, WC, tiles and the floor.

Shower screen and channel

The glass and the track, where grit hides.

En suite in a wider clean

One wet room inside a full after-construction visit.

Included

  • Sanitary ware, taps and tiles
  • Glass screens and shower channels
  • Mirrors and internal frames
  • The floor once grit is out of the track
  • Light sticker and cement haze where it lifts safely

Not this visit

  • We do not reseal showers, replace silicone or tank a wet room
  • We do not use acid on a finish we have not been told about
  • We do not clean a bathroom while the tiler is still working

How the visit runs

How Bathroom Post-Renovation Cleaning is done

The order keeps dust from being wiped into a paste or walked back onto a clean floor.

  1. 01

    Check the silicone is set

    Fresh silicone is left alone.

  2. 02

    Grit out of the channel first

    Otherwise it is washed onto the tray.

  3. 03

    Glass and chrome

    Film and spots, without a harsh pad on a new screen.

  4. 04

    Floor last

    So the room you walk out of is the finished one.

Cost

What changes the quote

You receive a quote for this property. Two homes with the same number of rooms can take very different time, so there is no flat price on this page.

01

Bath, shower tray or wet room

02

How much glass

03

Cement haze, stickers or silicone smear

04

Whether the silicone is fully set

05

One room or part of a whole-house clean

Full cost guide

Problems

What people notice first

People notice a dull screen, grit in the shower channel, and a white film on black tiles. Stickers on a new tray are the other common leftover. Failed silicone and a leak are a resealing job, not a clean. We will say so.

Before and after

Prep, and how long it should last

Wait until silicone has set and the fitter has gone. Remove towels and loose bottles. Tell us if any tile was treated with a sealer that is still curing. After the clean, a normal shower is fine once everything is dry.

If the dust comes back

The bathroom stays clean if no one is still cutting tiles or sanding the landing. A new dullness on the screen after that is usually fresh dust from elsewhere in the house, which a sparkle will lift.

FAQ

Questions about Bathroom Post-Renovation Cleaning

What does a bathroom clean after renovation include?

Sanitary ware, taps, tiles, glass, the shower channel and the floor. Set silicone is left in place. We do not reseal or retile.

Can you remove cement haze from new tiles?

Light haze that lifts with the right product can be included when we have seen it. Heavy adhesive left by the tiler is quoted as paint and adhesive removal, not hidden inside a bathroom wipe.

Is this a mould or reseal visit?

No. This is construction residue on a new bathroom. Black mould from daily use, and a failed shower seal, are a different trade. Say what you can see and we will tell you if we are the wrong booking.

Can I use the shower the same day?

Yes, once the room is dry and any product smell has gone. If silicone was still soft when we arrived, we will have left it and told you.

Should the bathroom be cleaned on its own?

If only that room was refurbished, yes. If the landing and bedrooms are also filmed with dust, book the full after-construction clean and include the bathroom in it.

Areas we cover

Post-construction cleaning across the UK

A few of the places with their own page. Open one for local detail, or browse the full list.

Quote this visit

Tell us the property, what the trades have finished, and when you need it. We reply by email or WhatsApp.

Prefer a message

WhatsApp

Message the postcode, the stage of the build, and the date you have in mind. There is no phone number on this site.

WhatsApp
Trustpilot stars Partner badge Google Guaranteed service provider badge BBB trust logo

A finished property should not still look like a building site.