After plastering or sanding
A white film covers skirtings, sills and the inside of empty shelves.
Who it is for
A white film covers skirtings, sills and the inside of empty shelves.
Grit sits in tracks, under plinths and along the hearth.
The dust has to go before a carpet or a seal goes down.
Variants
The film on joinery, radiators and empty shelves.
Offcuts, plug dust and sweepings a dustpan misses.
Stairs and landings where it has been walked through the house.
How the visit runs
The order keeps dust from being wiped into a paste or walked back onto a clean floor.
So dust is not pulled into a finished bedroom.
Wiping first turns the film into a paste.
Sills and rails before the floor.
We say if a next-day vacuum is worth doing.
Cost
You receive a quote for this property. Two homes with the same number of rooms can take very different time, so there is no flat price on this page.
Whether the dust is plaster, sanding dust or general site grit
How far it has travelled through the house
Carpet already fitted or bare floors
A bag of small debris versus a skip of waste
Problems
The sign is a white line along every skirting, and dust blowing back out of a household vacuum. Another is grit in sliding-door tracks and under a new kitchen plinth. A pile of rubble in the garden is waste removal, not this visit.
Before and after
Stop sanding before the visit. Cover open water tanks and food areas. After we leave, wait before you unpack fabrics. A quick vacuum the next day collects dust that was still in the air.
Fine dust comes back if someone sands again. It should not keep returning on a finished, closed-up house after a proper removal and one settlement vacuum.
FAQ
Plaster and sanding dust is very fine. It blinds household filters and blows back into the room. The visit vacuums that dust, then wipes. A broom makes it worse.
Yes, when it is small enough to bag and carry: packaging, plug dust, offcuts. Skip waste, soil and plasterboard stacks are a different job. Say which you have on the form.
After. Dust falls while joinery is wiped. Floors are left until that dust is under control.
This page covers mixed site dust and small debris. If the problem is specifically new plaster in the air and on every ledge, the plaster dust page is the closer match.
Once the agreed rooms are finished and dry underfoot. Keep fabrics out until you have done the next-morning vacuum we recommend.
Related
Areas we cover
A few of the places with their own page. Open one for local detail, or browse the full list.
Tell us the property, what the trades have finished, and when you need it. We reply by email or WhatsApp.
Prefer a message
Message the postcode, the stage of the build, and the date you have in mind. There is no phone number on this site.
WhatsApp